Numéro |
EPJ Web Conf.
Volume 153, 2017
ICRS-13 & RPSD-2016, 13th International Conference on Radiation Shielding & 19th Topical Meeting of the Radiation Protection and Shielding Division of the American Nuclear Society - 2016
|
|
---|---|---|
Numéro d'article | 02007 | |
Nombre de pages | 5 | |
Section | 2. Shielding Experiments & Benchmarks | |
DOI | https://doi.org/10.1051/epjconf/201715302007 | |
Publié en ligne | 25 septembre 2017 |
https://doi.org/10.1051/epjconf/201715302007
Shielding and Activation Analyses for BTF Facility at SNS
ORNL, PO box 2008, MS 6466, Oak Ridge, TN 37831-6474, USA
* Corresponding author: popovai@ornl.gov
Published online: 25 September 2017
The beam test facility (BTF), which simulates front end of the Spallation Neutron Source (SNS), has been built at the SNS, and is preparing for commissioning. The BTF has been assembled and will operate in one of service buildings at the site. The 2.5 MeV proton beam, produced in the facility, will be stopped in the beam dump. In order to support BTF project from radiation protection site, neutronics simulations and activation analyses were performed to evaluate the necessary shielding around the facility and radionuclide inventory of the beam stop.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.